The Breyne Act: how a buyer of a new build in Belgium is protected

When you buy a home in Belgium that is still to be built and pay before it is finished, the Breyne Act applies: no payment before the contract, a deposit of at most 5 % of the total price, then only the land and the works actually carried out, and a guarantee — a bond from an accredited contractor, or a guarantee of completion or of refund of the sums paid. A contract that omits what the law requires may be annulled at the buyer's choice.

  • Loi du 9 juillet 1971 (loi Breyne) · art. 1, 10, 12 et 13 · (source data as of 2026-10-09)

    source: www.ejustice.just.fgov.be

When the Act applies

The Act covers any contract to transfer or build a house or flat for living in, when the buyer must pay before the construction is finished. It does not protect a buyer whose usual business is building homes to sell them.

What the contract must contain

The contract names the owner of the land, the building permit, the plans and specifications signed by an architect, the total price and how it is paid, the start date and the deadline, and the way the works are accepted. The parties state that they have known these documents for 15 days.

The contract states whether it depends on obtaining a loan; that condition may not run longer than 3 months from the signature. Compensation for late delivery is set in the contract and may not be less than a normal rent of the finished home.

If the contract misses a required term or the guarantee, the buyer — and only the buyer — may have it annulled, before the notarial deed or, for a building contract, before provisional acceptance.

Payments follow the works

No payment may be asked before the contract. A deposit at signing may not exceed 5 % of the total price. At the notarial deed, the seller may claim the price of the land and the cost of the works carried out, approved by an architect; the rest is due in instalments that never exceed the works carried out.

If a promise to contract is not followed by the contract, the buyer's contractual indemnity may not exceed 5 % of the total price.

Buying a home in Belgium: registration duties, VAT, notary and the cash you need

Completion guarantee or bond

A contractor accredited under the accreditation law lodges a bond of 5 % of the building price with the Deposit and Consignment Office and proves it to the buyer within 30 days. The buyer may draw on it for delay or non-performance; it is released in halves, at provisional and at final acceptance.

A seller who is not accredited must guarantee either completion of the home or the refund of the sums paid if the contract is dissolved for want of completion. A completion guarantee is the joint surety of a bank or insurer to pay what is needed to finish the home; for a building contract the certificate is handed over within 30 days. It ends at provisional acceptance.

Price revision

The price of the building may be revised for wages and materials on at most 80 % of it, and for wages on at most 50 %.

Acceptance and risk

Ownership of what is built passes to the buyer as the materials are incorporated, but the risk stays with the seller until provisional acceptance. Final acceptance may take place only 1 year after the provisional one.

Decennial liability

The architect and the contractor — and, under the Breyne Act, the seller — are liable for 10 years for defects that threaten the building's stability or solidity. A new book of the Civil Code, already published, will replace these articles.

  • Code civil (ancien), art. 1792 et 2270 · art. 1792 et 2270 (loi Breyne, art. 6) · (source data as of 2026-10-09)

    source: www.ejustice.just.fgov.be

The builder's mandatory insurance

For housing in Belgium where an architect is required, architects and contractors must insure their decennial liability; the policy covers the solidity and stability of the closed shell, and its watertightness when a leak threatens solidity or stability, for 10 years from acceptance of the works.

  • Loi du 31 mai 2017 (assurance décennale) · art. 2, 3 et 5 · (source data as of 2026-10-09)

    source: www.ejustice.just.fgov.be

Sanctions

Breaching the rules on the contract, price revision, acceptance or buy-back is fined up to 4 % of the offender's annual turnover when that is higher than the fixed maximum; breaching the payment or guarantee rules, up to 6 %.

VAT on the building

A new building is sold with VAT at 21 %; the land share bears the registration duty of the region unless the same seller sells it with the building under VAT.

  • Code de la TVA et arrêté royal n° 20 · art. 1 §9; AR n° 20, art. 1 · (source data as of 2026-10-09)

    source: www.ejustice.just.fgov.be

Registration duties in Belgium: Flanders, Wallonia and Brussels

How other countries protect a new-build buyer

The table compares the protection of deposits, construction insurance, defect liability, late delivery and staged payments with the other countries of the site.

What to compare Portugal Spain Poland Belgium
Legal protection of deposits and advance payments no mandatory rule — only a claim against the seller for double the deposit; the law requires no guarantee, insurance or escrow account Código Civil (Decreto-Lei n.º 47344/66), art. 442.º n.º 2 · 2026-10-07 required by law Ley 38/1999, DA 1.ª, Uno.1 a) y b), Uno.2 · 2026-10-08 required by law Ustawa o ochronie praw nabywcy lokalu mieszkalnego lub domu jednorodzinnego, art. 6–8, art. 46–49 · 2026-10-09 required by law: a bond of 5 % of the building price lodged by an accredited contractor; otherwise a completion guarantee from a bank or insurer, or a guarantee of refund of the sums paid Arrêté royal du 21 octobre 1971, art. 3 et 4 (loi Breyne, art. 12) · 2026-10-09
Mandatory construction insurance no mandatory rule — the technical professionals carry third-party liability insurance, which is not insurance in the buyer's favour Decreto-Lei n.º 84/2021, arts. 22.º–25.º: responsabilidade do profissional, sem seguro · 2026-10-08 Lei n.º 31/2009, art. 24.º n.º 1 · 2026-10-08 required by law Ley 38/1999, art. 19.1 c); DA 2.ª, Uno · 2026-10-08 no mandatory rule — the buyer's money is protected by the escrow account and the DFG guarantee fund, not by insurance of the works Ustawa o ochronie praw nabywcy lokalu mieszkalnego lub domu jednorodzinnego, art. 6 ust. 1 · 2026-10-09 required by law Loi du 31 mai 2017 (assurance décennale), art. 5; art. 2; art. 21 · 2026-10-09
Defect liability period 10 years / 5 years Decreto-Lei n.º 84/2021, art. 23.º n.º 1 · 2026-10-08 10 years / 3 years / 1 year Ley 38/1999, art. 17.1 · 2026-10-08 5 years Kodeks cywilny, art. 568 § 1; ustawa o ochronie praw nabywcy, art. 41a · 2026-10-09 10 years for defects that threaten the building's stability or solidity — architect, contractor and seller Code civil (ancien), art. 1792 et 2270, art. 1792 et 2270 (loi Breyne, art. 6) · 2026-10-09
Late delivery: what the law provides general rules: double the deposit back or specific performance Código Civil (Decreto-Lei n.º 47344/66), arts. 442.º n.os 2 e 3, 808.º · 2026-10-07 rescission with refund and legal interest, or an extension Ley 38/1999, DA 1.ª, Cuatro · 2026-10-08 an extra 120 days deadline set by the buyer, then withdrawal without costs and a refund; the contractual penalty is kept Ustawa o ochronie praw nabywcy lokalu mieszkalnego lub domu jednorodzinnego, art. 43 ust. 1 pkt 6 i ust. 3; art. 44 · 2026-10-09 compensation fixed in the contract, at least a normal rent of the finished home Loi du 9 juillet 1971 (loi Breyne), art. 7, f · 2026-10-09
Staged payments to the developer no mandatory rule Código Civil (Decreto-Lei n.º 47344/66), art. 410.º: forma do contrato-promessa, sem regime de pagamentos · 2026-10-07 no mandatory rule Ley 38/1999, DA 1.ª, Uno.1 b): cuenta especial; calendario de pagos no regulado · 2026-10-08 payments into the escrow account after each completed stage; each stage between 10 % and 25 % of the cost (open account) Ustawa o ochronie praw nabywcy lokalu mieszkalnego lub domu jednorodzinnego, art. 8; art. 24 ust. 2 · 2026-10-09 a deposit of at most 5 % of the total price; at the notarial deed, the land and the works done; then instalments never above the works done Loi du 9 juillet 1971 (loi Breyne), art. 10 · 2026-10-09

What this page does not contain

Some points depend on sources this page has not read:

  • court practice on hidden defects that do not affect stability;
  • how lenders release a construction loan in instalments;
  • the planned reform of the Breyne Act, which is not yet law.